Chicago land's Premier Fabricators Since 1958

 

Call Us: 773.722.9855

TELECOM INFRASTRUCTURE  Working closely with Baran Telecom and AT &T Engineering team we were able to design and build a cost effective ground site equipment platform to meet the following criteria: Load capacity 2500 lbs. Ease of field assembly Quickly & cost effectively Fabricated Readily made in up to 6 different sizes Fully adjustable screw jack style legs After a 10 day design schedule, We forwarded our electronic drawings to AT&T 's Engineering team for design approval. In three weeks time, 30 completed platforms of three different sizes were delivered to field crews in central Wisconsin for field installations. 10 days later, a 2nd round of 30 platforms were on-site to finish the build. All installed without the need of concrete footings because of the "screw jack leg design". This displays how good design techniques can facilitate quick turn around in fabrication times and save money by implementing new design quickly. "From design to installation in no time at all".

3040  West Carroll Ave. Chicago , il 60612

Phone: (773) 722-9855

 

Orsolini Welding Fabricators @ 2015

 All Rights Reserved